Key statistics
On Friday, Calibre Mining Corp (CXB:TOR) closed at 2.65, -5.69% below its 52-week high of 2.81, set on Sep 19, 2024.
52-week range
Short selling activityProvided by S&P Global Market Intelligence
Open | 2.59 |
---|---|
High | 2.66 |
Low | 2.58 |
Bid | 2.62 |
Offer | 2.65 |
Previous close | 2.57 |
Average volume | 2.97m |
---|---|
Shares outstanding | 787.72m |
Free float | 737.13m |
P/E (TTM) | 20.65 |
Market cap | 2.09bn CAD |
EPS (TTM) | 0.1283 CAD |
Data delayed at least 15 minutes, as of Oct 04 2024 21:00 BST.
More ▼
Announcements
- Calibre Strengthens its Executive Leadership Team with the Appointment of Chief Operating Officer and Vice President of Technical Services, Nicaragua
- Calibre Makes a New Discovery Along the VTEM Gold Corridor at the Limon Mine; Drilling at the Past Producing Talavera Mine Hits Additional High-Grades; Drilling Intercepts Include 13.26 g/t Gold Over 4.9 Metres and 4.92 g/t Gold Over 10.3 Metres
- Calibre’s Marathon Pit Ore Control Drilling at the Valentine Gold Mine Yields 44% Additional Gold on 47% Higher Grades Than Modelled in the 2022 Mineral Reserve
- Calibre Continues to Discover Near Surface, Above Reserve Grade Gold Mineralization at the Pan Mine in Nevada; Drilling Intersects Include 0.45 g/t Gold Over 117.4 Metres and 0.56 g/t Gold Over 59.4 Metres
- Calibre Continues to Intercept High-Grade Gold Mineralization at Its Eastern Borosi Mine Complex; Drilling Intersects Include 13.24 g/t Gold Over 5.8 Metres and 11.62 g/t Gold Over 3.8 Metres
- Calibre Reports Q2, 2024 and Year-To-Date Financial Results and Remains on Track to Deliver into Full Year Production Guidance While the Multi-Million Ounce Valentine Gold Mine Progresses to Construction Completion in Canada
- Calibre Delivers First Ore From the Volcan Open Pit Located 5 Km From the Libertad Mill, Leading to a Stronger H2, 2024
- Calibre Announces Receipt of the Federal Environmental Assessment Approval for the Berry Pit at the Valentine Gold Mine, Newfoundland & Labrador, Canada
- Calibre Appoints Sian Tasaka to the Board of Directors
- Calibre to Commence an Expanded 100,000 Metre Resource Expansion and Discovery Drill Program Across its Flagship Valentine Gold Mine Property
More ▼