ALLIED GOLD ANNOUNCES SECOND QUARTER 2024 RESULTS: SETTING THE STAGE FOR A STRONG SECOND HALF WITH CRITICAL INVESTMENTS TO SUSTAIN PRODUCTION AND REALIZE UNPARALLELED GROWTH POTENTIAL
-
Additional Oxide
Ore Feed at Sadiola: As anticipated, ore from Diba was exposed and became available for mining in late June. Limited quantities were processed as part of industrial-scale tests to assess plant behavior, yielding positive results. Further production and initial sales of gold from Diba are expected to commence during the third quarter, subject to the receipt of authorizations for processing at Sadiola, which are currently in progress. Diba, an oxide and higher-grade ore body, is expected to significantly contribute to the company's production at Sadiola this year, replacing some of the lower-grade fresh ore initially planned for the plant. Exploration continues at Sekekoto West, FE4, and Tambali South to uncover additional near-surface oxide gold mineralization, maximizing short-term production and cash flows, and building a growing inventory of Mineral Resources. - Investment in Self-Reliance and Operational Flexibility: During the second quarter, Côte d'Ivoire experienced sporadic power generation issues, leading to intermittent unplanned shutdowns of the processing plants. To address this, and as part of the Company's broader objective of becoming more self-reliant, Allied successfully installed backup generators at its Côte d'Ivoire operations. This investment effectively mitigated future power reliability risks. In addition to the immediate installation of generators, the Company is also discussing a turnkey solar power solution with a solar power provider. Bonikro and Agbaou demonstrated their operational mining capacity, significantly exceeding processing levels that were previously affected by these issues, which were rectified during the quarter.
-
Executing Financial Strategy: On August 7, 2024, the Company entered into a gold streaming agreement with a wholly-owned subsidiary of
Triple Flag Precious Metals Corp. ("Triple Flag"). Under the terms of the agreement, Allied will receive aUS$53 million upfront cash payment (the "Advance Amount") and Triple Flag will purchase 3% of the payable gold produced at each of the Agbaou and Bonikro mines, subject to a step-down to 2% after set delivery thresholds, in exchange for the Advance Amount and an ongoing payment equal to 10% of the spot gold price. Closing of the transaction and receipt of the of the Advance Amount is subject to certain conditions precedent, including certain third-party consents and agreements, and completion of related security documents which are expected to be completed in short order. Given the competitive cost of capital realized via the Côte d'Ivoire stream and strong market feedback, Allied is arranging a minimum$250 million Kurmuk funding package comprising a gold stream and a gold prepay facility for the development project. This comprehensive funding solution is expected to close by the end ofSeptember 2024 . The prospective stream validates the opportunities at Kurmuk, including its strong geological upside potential, and has attracted significant interest at a low cost of capital. The gold prepay facility would bring forward cash flow and include a built-in gold price hedge amidst favorable market prices. -
Progress on Exploration and Growth Initiatives: Exploration efforts continued to yield positive results in the second quarter, as shown in the press releases on
April 10 andJune 26 , 2024. The Company confirmed high prospectivity at Kurmuk's Tsenge gold prospect and new oxide discoveries at Sadiola's Sekekoto West, supporting the Company's goal of growing significant Mineral Reserves and Mineral Resources. Key advancements at Kurmuk include progress on the EPCM Early Works contract under DRA Global Limited, ongoing procurement of long-lead items including the ball mill (in addition to the already owned SAG mill), and the tendering process for contract mining and bulk earthworks.
SECOND QUARTER HIGHLIGHTS
Financial Results
- Net Profit before Income Tax for the three months ended
June 30, 2024 was$36.1 million . - Second quarter net earnings(2) of
$8.3 million or$0.03 per share basic and diluted. - Adjusted first quarter net earnings(1)(2) of
$15.9 million or$0.06 per share basic and diluted, largely reflecting shared-based compensation and adjustments for non-recurring items related to unrealized losses on the revaluation of financial instruments. - EBITDA(1) and Adjusted EBITDA(1) for the for the three months ended
June 30, 2024 was$56.2 million and$63.7 million respectively, both of which represented a significant increase from the prior year comparative period. The Company's strong EBITDA(1) demonstrates its strong cash-flow generating ability and continued operational efficiencies. - Operating cash flow before income tax paid and movements in working capital was
$56.9 million , up significantly from both the first quarter of 2024 and the comparative prior period quarter. - Net cash used in operating activities for the three months ended
June 30, 2024 was$6.2 million , negatively impacted by anticipated income tax payments in the second quarter and working capital movements. Working capital was primarily affected by the timing of VAT credit receipts at Sadiola, the buildup of inventory stockpiles for Diba and Bonikro, the seasonal buildup of materials and supplies in anticipation of the rainy season inMali , finished goods awaiting shipment, and, to a lesser extent, the general timing of accounts payable. Cash flows from operating activities are expected to materially increase through the remainder of 2024, driven by increased production contributions, lower costs in the second half of the year, and more normalized adjustments for changes to working capital. - Expenses are expected to continue to trend lower over the remainder of the year, with quarter-over-quarter savings and improvements expected, the most significant of which are expected in the second-half of the year. As costs further decrease, and production increases, the per ounce cost of general and administrative expenses will decrease more than commensurately.
- Cash and cash equivalents totaled
$78.0 million as atJune 30, 2024 . With an expected strong second half of the year, punctuated by anticipated higher production and lower costs, which creates a step-change in cash flow generation, the Company is well positioned to cover its upcoming capital expenditure ramp-up at Kurmuk. Further, cash is expected to meaningfully increase in the third quarter with the closing of the$53 million streaming agreement with Triple Flag, subject to the satisfaction of conditions precedent.
Operational Results – Delivering on H1 Guidance with Improvements Expected in H2
Operating results year-to-date are consistent with the midpoint of the Company's guided range, taking into account the expected production split between the first and second halves of the year, despite the aforementioned power disruptions in Côte d'Ivoire and mining outpacing processing at Diba.
|
For three months ended |
For six months ended |
YTD Percentage |
||
|
2024 |
2023 |
2024 |
2023 |
Improvement |
Gold Ounces Produced |
88,135 |
85,983 |
173,312 |
164,589 |
5 % |
Allied's sustainable production base continues to demonstrate a solid platform for significant growth, with consolidated production higher in both Q2 and the first half of the year compared to the same periods in the prior year. Production would have been approximately 13% higher, adjusting for:
- Contributions from Diba: Ore from Diba was exposed and available for mining late in June, as planned, in order to commence the industrial scale tests at the Sadiola plant to confirm and optimize processing parameters. As such, limited quantities of ore were processed during the month to conduct these tests and assess the processing plant behavior and controls for the higher-grade ores in particular, and these tests were successful. The plant trial yielded production at better than expected grades. Further production and initial sales of gold from Diba are expected to commence during the third quarter, subject to the receipt of authorizations for processing at Sadiola, which are currently in progress. Diba, an oxide and higher-grade ore body, is expected to represent a significant component of the Company's production at Sadiola this year, displacing some of the lower-grade ore originally planned to be fed through the plant. This is expected to improve both production and cost efficiency. The quarter ended with approximately 175,000 tonnes of oxide ore stockpiled at Diba from the Korali-Sud mining license, representing approximately 6,400 ounces of mined gold. This stockpile included 74,000 tonnes of ore at an average grade of 1.9 g/t, which would have been processed had the formal authorizations been received during the quarter. These ounces would have been additive to production in the second quarter, but are not included in the total disclosed production. Further, exploration continues at Sekekoto West, FE4, and Tambali South to define additional near-surface oxide gold mineralization, with the objective of maximizing short-term production and cash flows, and building a growing inventory of Mineral Resources.
-
Côte d'Ivoire operations: As part of the Company's broader objective of becoming more self-reliant, backup generators were successfully installed in the second quarter at its Côte d'Ivoire operations for an initial unbudgeted cash outlay of
$14.1 million . This investment, spread across its in-country operations, effectively mitigated future power reliability risks. Côte d'Ivoire continued to experience issues at some of its power generation plants during the second quarter, leading the mining industry to reduce consumption by intermittently shutting down processing plants while power generation equipment was restored to the grid. In addition to the immediate installation of generators, the Company is also discussing a turnkey solar power solution with a solar power provider. Bonikro and Agbaou demonstrated their operational mining capacity, significantly exceeding processing levels that were previously affected by these issues, which were rectified during the quarter by the aforementioned mobilization and installation of generators. The Company anticipates that it would have produced approximately 8,625 ounces more, comprising 5,175 and 3,450 ounces at Bonikro and Agbaou, respectively, had the intermittent power shutdowns not occurred.
As previously disclosed, production is expected to be weighted to the second half of the year with quarter over quarter variances due to mine sequencing and accessing higher grades as per the mining plan, along with the implementation of operational improvements. Production is expected to sequentially increase in the third quarter, and stay roughly the same in the fourth quarter, all of which aligns with Allied's guidance of 375,000 to 405,000 ounces for 2024 at a mine-site AISC(1) of
On a longer-term outlook, the Company continues to target production of 400,000-450,000 oz at a mine-site AISC(1) below
Advancement of Key Growth Initiatives
Kurmuk
The project implementation team, which boasts strong African project delivery capabilities, began focusing on early works execution planning in the fourth quarter of 2023, continuing through the first half of 2024. To date, the Company has completed execution planning and preparation activities, which included mobilizing the EPCM contractor to the site, advancing detailed engineering, and formalizing and executing the procurement plan. Activities also included defining and implementing all project procedures, planning logistics, tracking key logistic deliveries such as camp facilities, and placing orders for key early works contracts, including the installation of the starter camp and the construction of the temporary water dam. The construction of the temporary water dam, built by a local earthworks contractor under DRA's supervision, was completed on schedule and the dam is now full. Additionally, the construction camp build is advancing, with earthworks, civil works, and delivery of modules for the main 1,600-person camp ongoing. Operational readiness remains a key focus, with planning and preparation activities underway, including the recruitment of the General Manager and other operating positions. The Company intends to award the mining contract in the near future, with the objective of advancing earthworks and allowing for the early mobilization of equipment and the development of customs, importation, and logistics systems well ahead of the timeframe when mining will begin.
Exploration efforts continued to yield positive results in the second quarter. The Company announced positive exploration results at Kurmuk's Tsenge gold prospect, confirming high prospectivity for the property. These results support the Company's objective to deliver significant Mineral Resource growth. The continued progress in both project development and exploration activities underscores Allied's dedication to maximizing the potential of Kurmuk and establishing it as a significant gold mineral province in
The Company looks forward to providing further updates as exploration and construction activities progress, and the project moves closer to its goal of delivering increased and sustainable value to stakeholders.
Sadiola
Current efforts have been aimed at increasing the inventory of oxide and fresh ores, optimizing mining and processing, and conducting several technical studies on processing fresh ores through existing facilities. This will be followed by the development of a new plant dedicated to processing fresh ore and implementing enhancements to existing facilities to benefit both the current and planned new plant.
Significant improvements in production are targeted in the short term due to contributions from high-grade oxide ore. The goal is to maintain production levels between 200,000 and 230,000 ounces per year over the next two years, reduce AISC(1), increase revenue, and provide robust cash flows in 2024 and 2025 to support development projects across the Company. This approach enables the mine to produce at elevated levels while incurring lower near-term capital costs.
Pre-construction activities for the Phase 1 Expansion are progressing well, with detailed engineering, procurement, and execution planning continuing. The updated engineering study for this phase reconfirmed a total capital expenditure of approximately
The Company is also advancing optimization opportunities for the project, including metallurgical test work and a pre-feasibility study to potentially increase recoveries by over 10% through the use of flotation and concentrate leaching. This study, supported by the Company's phased investment, seeks to significantly improve the project's financial performance. With this long-term and value-focused strategy, the Company is well-positioned to affirm that the advancement of the
Financing Strategy
The Company's ability to unlock the significant value in its large and expanding mineral inventory is supported by the financial flexibility needed to internally fund these optimizations and growth initiatives. Based on recent gold prices, the Company expects to be fully financed through cash flows; however, as a precaution, so that the Company is not dependent on the price of gold, Allied is actively executing a select number of non-dilutive alternatives. This strategic direction is prompted by the current capital markets not fully capturing the inherent value of the Company's assets, leading Allied to seek alternative sources of capital that offer low-cost options with the added benefit of more accurately reflecting true value to market participants.
In association with these efforts, on
The transaction recognizes the inherent value of the
Given the competitive cost of capital realized via the Côte d'Ivoire stream and strong market feedback, Allied is arranging a minimum
The gold prepay facility would bring forward cash flows and include a built-in gold price hedge amidst favorable market prices. This prepay would begin gold deliveries after Kurmuk's anticipated mid-2026 construction timeframe, further balancing the cash requirements for its construction. Lastly, a further benefit of this financing plan is that it will provide the Company further financial flexibility to apply cash flows from existing operations, which are expected to increase because of ongoing operational improvements, toward possible acceleration of expansion plans at Sadiola and maximizing value creation and returns to shareholders.
Sustainability
- The Company did not report any significant Environmental Incidents for the three and six months ended
June 30, 2024 . - For the quarter ended
June 30, 2024 , the Company reported two Lost Time Injuries ("LTI"), resulting in a Lost Time Injury Rate ("LTIR") of 0.54(4).
OPERATING RESULTS SUMMARY
|
For three months ended |
For six months ended |
||
|
2024 |
2023 |
2024 |
2023 |
Gold ounces |
|
|
|
|
Production |
88,135 |
85,983 |
173,312 |
164,589 |
Sales |
84,611 |
75,373 |
169,747 |
158,848 |
Per Gold Ounce Sold |
|
|
|
|
Total Cost of Sales(4) |
$ 1,547 |
$ 1,586 |
$ 1,581 |
$ 1,584 |
Cash Costs(1) |
$ 1,355 |
$ 1,418 |
$ 1,376 |
$ 1,427 |
AISC(1) |
$ 1,498 |
$ 1,578 |
$ 1,530 |
$ 1,561 |
|
|
|
|
|
Average revenue per ounce |
$ 2,309 |
$ 1,921 |
$ 2,181 |
$ 1,881 |
Average market price per ounce* |
$ 2,338 |
$ 1,975 |
$ 2,206 |
$ 1,931 |
*Average market prices based on the LMBA PM Fix Price |
Sadiola
For the three months ended
Following a re-optimization, pit sequencing has been enhanced for 2024, and additional emphasis is being put into improving mining performance. Plant performance was in line with expectations, with the focus having successfully remained on ore-crushing and screening throughout the quarter. Production was also positively impacted in relation to the comparative quarter, as aforementioned by improving feed grade, due to ore type blending. Recovery percentages were in line with projection based on ore types, despite being lower than prior year comparatives.
The Company is advancing its power generation facilities to enhance stability and reduce costs, which includes installing a centralized automated system. Furthermore, with the completion of a new oxygen plant earlier in the year to lower costs and improve recoveries, Sadiola is undertaking additional improvement initiatives.
Gold sales for the current quarter were relatively in line with production, resulting from timing of shipments.
In 2023, the Government of
Meaningful improvements in production are targeted in the short term as a result of the contribution from Diba high-grade oxide ore, with the objective to support production levels between 200,000 and 230,000 ounces per year in the next two years, reduce AISC(1), increase revenue, and provide robust cash flows in 2024 and 2025, to support development projects across the Company.
Engineering studies at Diba resulted in a maiden Proven and Probable Mineral Reserve declared on
The discovery of additional economic oxide mineralisation has the potential to improve upon these targets, and as such exploration activities, resource modeling and engineering studies are in progress for several areas and new discoveries of oxide ore, including those at S12, Sekekoto West, FE4 and Tambali South, among others. These developments are a key part of the Company's strategy, allowing for the optimized utilization of existing resources and infrastructure, and supplement Diba ore feed, further contributing to production and costs improvements for the next several years, providing mine plan flexibility with more areas for mining.
During the second quarter, exploratory and Mineral Resource drilling programs were conducted on the Sadiola and Diba mining licenses. A total of 280 holes were drilled for 24,975 metres by 5 drill rigs, with 109 holes for 11,776 metres completed at Sadiola and 171 holes for 13,199 metres completed at Diba. Resource drilling programs were completed on the Sadiola mining license ("ML") at
Exploratory drilling at Sekekoto West continues to extend mineralisation along strike to the north, with incremental step outs pinning the narrow steep high-grade zone in the oxide. Phased drilling around this has defined 1.1 kilometres of continuous strike of mineralisation at the prospect. Similarly exploratory drilling has met with success at FE2.5 also defining approximately 1 kilometre of strike of oxide mineralisation. At both prospects, down-dip core drilling has demonstrated that tectonic breccias are sulphide mineralised and lie beneath the oxide mineralisation, demonstrating further opportunity to develop sulphide resources. The prospects are developed on faults cutting across the north-south orientated lithological contacts between limestones and sandstones. A second trend of mineralisation identified at FE2.5 some 400m to the west on a parallel contact is currently the subject of a first pass drilling program and this will continue into Q3 with the aim of yielding shallow oxide resources.
Allied is focused on optimizing the oxide mineral inventory at Sadiola, aiming to enhance the mine's value by leveraging ongoing exploration successes.
Bonikro
Bonikro produced 20,496 ounces of gold during the three months ended
As part of the Company's broader objective of becoming more self-reliant, backup generators were successfully installed in the second quarter at its Côte d'Ivoire operations for an initial unbudgeted cash outlay of
The sequential increase in gold production over the first quarter resulted from focused mining in the
Several other opportunities to optimize the plant further are being pursued, including, but not limited to operational and maintenance practices, comminution circuit optimizations, increased gravity gold recovery, better slurry density, and viscosity control practices. Several are already implemented or studied, and will ultimately allow for mill rate improvements, and more predictability of throughput and recoveries. During the second quarter, the sizing screen panels were changed and modified from 40mm to 35mm, improving the mill rate considerably, by almost 9%, with the current ore blend. The Company expects to provide updates on further initiatives later this year.
At Bonikro, expected cost reductions are to be achieved through the normalization of production with the more self-reliant power strategy. However, as expected and guided, Bonikro's sustaining capital and AISC(1) in the second quarter were impacted by capitalized stripping at Pushback 5 ("PB5"). The stripping activities being carried out during the year will improve production and costs for the next few years, as high grade ore will be exposed while significantly lower waste removal is planned. The classification of stripping costs to sustaining capital was changed in the fourth quarter of 2023, with first production from the pushback achieved in that quarter. Prior year comparative costs associated with PB5, which did not have any ore production in the second quarter of 2023, were deemed as expansionary capital and consequently did not impact AISC(1). Further, the increase in depreciation and amortization from the comparative prior quarter is related to amortization of the PB5 expansionary deferred stripping, which commenced in the fourth quarter of 2023.
During the second quarter, gold sales were slightly lower than production due to timing of production and shipments.
At Bonikro, the stripping of PB5 during 2024 is expected to expose higher-grade materials in 2025 and 2026. Although the cost profile for 2024 reflects those activities, they will significantly reduce the mine-site AISC(1) to below
Previously provided production guidance from Côte d'Ivoire is not expected to change in the Company's guidance and outlook periods.
Mineral Resource and exploration drilling was conducted during the quarter on the Company's mining licenses and exploration licenses. A total of 223 holes for 20,582 metres was drilled by seven exploration drill rigs. With the following drilling activity split across the properties:
At the Hire mine, core drilling to the WSW of the Agbale prospect, which is expected to be processed at Agbaou, underneath and adjacent to the Akissi-So waste rock dump was completed during the quarter. The program has been successful in identifying a high-grade vein-style target that was previously unrecognised and represents an underground style target for resource growth. Two rigs were moved to the area immediately west of the Assondji-So pit around the ROM pad and are exploring mineralised trends defined in historical drilling and artisanal workings. This program was in progress at quarter end and initial results and shallow oxide intersections are encouraging, demonstrating at least 160 metres of strike of a mineralised shear. This area of the mine will be the focus of exploratory and resource infill drilling in the third quarter.
At the
On the wider Hire and Agbaou MLs a target generation exercise began with the commencement of field programs at the Ditula prospect and prioritisation of other targets known from historical sampling programs.
On the Bonikro ML and EL no work programs were undertaken.
Agbaou
Agbaou produced 15,855 ounces of gold during the three months ended
A series of actions continue to enhance mining performance at Agbaou, including improvements to the dewatering infrastructure and better management of the mining contractor. The Company is also studying processing plant upgrades to increase ore feed flexibility. Furthermore, efforts to develop new oxide deposits like Agbale have been accelerated, with mining currently underway.
Gold sales during the quarter were generally in line with production.
Costs for the second quarter were impacted by the inclusion of Agbale ounces, and in particular the costs of sustaining capital expenditures related to its development, which are disproportionate to the production levels. However, with the Côte D'Ivoire complex now being with the same contractor, the Company expects synergies and the reduction of costs going forward. At Agbaou, expected cost reductions are to be achieved through the normalization of production after the aforementioned contractor changeover in the first quarter, process optimizations, and the normalization of the power matters. Had the power delivery issues not occurred, the Company expects that production at Agbaou would have been higher by approximately 3,450 ounces of gold.
The Company remains confident on meeting its annual mine plan. The blend ratio feeding the Agbaou plant remains critical with quality oxide ore, which resulted in accelerating the mining plan of Agbale Phase 2 into production, which has continuously delivered on grade, and has provided significant flexibility in the first quarter for the Agbaou plant blended ore requirements.
The Company is focused on extending the life of its mines in Côte d'Ivoire through strategic exploration and resource management, with new life-of-mine planning at Agbaou supporting a total gold production strategic goal of over 465,000 ounces through 2028 at a mine-site AISC(1) below
During the quarter, extensive Mineral Resource and exploration drilling activities were undertaken on Agbaou's mining licenses, with 65 holes for a total of 8,003 metres.
At Agbaou, exploratory drilling at North Pit Extension was completed, with core drilling demonstrating deeper extensions of fresh rock mineralisation. First pass drilling was completed at the Agbaou South prospect, with initial intersections generated in line with historical RC drilling. A program of core drilling is underway to better understand the controls on mineralisation and better target follow-up drilling.
The exploration work and focus at both Agbaou and Bonikro continue to align with the Company's strategic aim to establish a sustainable production platform of 180,000 to 200,000 oz per annum over a mine life of more than 10 years.
Progress at Kurmuk
During the second quarter, resource drilling was focused on a scout drilling exercise at the Tsenge prospect on the Mestefinfin Exploration Licence , and a total of 15 holes for 4,001 metres was drilled. At quarter end the program was 21% complete for 26 of a revised program of 125 planned holes.
On
Mapping, channel sampling and core drilling during the quarter on the Tsenge prospect area continued to produce success and generate economic widths and gold grades in both drill road face channels and core holes. An approximate 1 kilometre area has been defined at the Setota Target as the primary area of interest for infill drilling, between the initial 200 metre spaced drill fences and the will the primary focus of the exploratory drilling in the third and fourth quarters.
On
The Company continues to advance the project with a target production start date in mid-2026.
For three months ended
|
Production Gold |
Sales Gold |
Cost of Sales Per |
Cash Cost(1) Per |
AISC(1) Per Gold |
|
51,784 |
50,509 |
$ 1,221 |
$ 1,179 |
$ 1,241 |
|
20,496 |
19,036 |
$ 1,814 |
$ 1,248 |
$ 1,515 |
|
15,855 |
15,066 |
$ 2,304 |
$ 2,079 |
$ 2,336 |
Total |
88,135 |
84,611 |
$ 1,547 |
$ 1,355 |
$ 1,498 |
FINANCIAL SUMMARY AND
Key financial operating statistics for the second quarter 2024 are outlined in the following tables.
(In thousands of US Dollars, except for shares and per share amounts) (Unaudited) |
For three months ended |
For six months ended |
||
2024 |
2023 |
2024 |
2023 |
|
Revenue |
$ 195,614 |
$ 145,012 |
$ 370,681 |
$ 299,332 |
Cost of sales, excluding depreciation, depletion and amortization ("DDA") |
(117,893) |
(110,962) |
(241,206) |
(233,853) |
Gross profit excluding depreciation and amortization(1) |
$ 77,721 |
$ 34,050 |
$ 129,475 |
$ 65,479 |
DDA |
(13,004) |
(8,575) |
(27,139) |
(17,714) |
Gross profit |
$ 64,717 |
$ 25,475 |
$ 102,336 |
$ 47,765 |
General and administrative expenses |
$ (15,240) |
$ (11,273) |
$ (29,401) |
$ (21,898) |
Gain (loss) on revaluation of call and put options |
— |
4,454 |
— |
(5,546) |
Loss on revaluation of financial instruments and embedded derivatives |
(2,099) |
(667) |
(3,882) |
(1,813) |
Other (losses) income |
(4,214) |
343 |
(7,629) |
387 |
Net earnings before finance costs and income tax |
$ 43,164 |
$ 18,332 |
$ 61,424 |
$ 18,895 |
Finance costs |
(7,082) |
(6,773) |
(12,719) |
(12,712) |
Net earnings before income tax |
36,082 |
11,559 |
48,705 |
6,183 |
Current income tax expense |
$ (18,894) |
$ (6,387) |
$ (27,380) |
$ (19,923) |
Deferred income tax expense |
(769) |
(1,234) |
(5,748) |
(1,683) |
Net earnings (loss) and total comprehensive earnings (loss) for the period |
$ 16,419 |
$ 3,938 |
$ 15,577 |
$ (15,423) |
|
|
|
|
|
Earnings (loss) and total comprehensive earnings (loss) attributable to: |
|
|
|
|
Shareholders of the Company |
$ 8,298 |
$ 1,147 |
$ 2,613 |
$ (19,286) |
Non-controlling interests |
8,121 |
2,791 |
12,964 |
3,863 |
Net earnings (loss) and total comprehensive earnings (loss) for the period |
$ 16,419 |
$ 3,938 |
$ 15,577 |
$ (15,423) |
|
|
|
|
|
Net earnings (loss) per share attributable to shareholders of the Company |
|
|
|
|
Basic and Diluted |
$ 0.03 |
$ 0.01 |
$ 0.01 |
$ (0.11) |
(In thousands of US Dollars, except per share amounts) |
For three months ended |
For six months ended |
||
2024 |
2023 |
2024 |
2023 |
|
Net Earnings (Loss) attributable to Shareholders of the Company |
$ 8,298 |
$ 1,147 |
$ 2,613 |
$ (19,286) |
Net Earnings (Loss) attributable to Shareholders of the Company per Share |
$ 0.03 |
$ 0.01 |
$ 0.01 |
$ (0.11) |
(Gain) loss on revaluation of call and put options |
— |
(4,454) |
— |
5,546 |
Loss on revaluation of financial instrument |
2,099 |
667 |
3,882 |
1,813 |
Foreign exchange |
568 |
— |
832 |
1,558 |
Share-based compensation |
2,011 |
3,686 |
4,138 |
3,687 |
Other adjustments |
2,881 |
(1,798) |
4,963 |
(3,641) |
Tax adjustments |
(3) |
— |
351 |
— |
Total increase (decrease) to Attributable Net Earnings (Loss)(2) |
$ 7,556 |
$ (1,899) |
$ 14,166 |
$ 8,963 |
Total increase (decrease) to Attributable Net Earnings (Loss)(2) per share |
$ 0.03 |
$ (0.01) |
$ 0.06 |
$ 0.05 |
Adjusted Net Earnings (Loss)(1) |
$ 15,854 |
$ (752) |
$ 16,779 |
$ (10,323) |
Adjusted Net Earnings (Loss)(1) per Share |
$ 0.06 |
$ (0.01) |
$ 0.07 |
$ (0.03) |
Second Quarter 2024 Conference Call
The Company will host a conference call and webcast on
Toll-free dial-in number ( |
1-800-898-3989 |
Local dial-in number: |
416-406-0743 |
Toll Free ( |
00-80042228835 |
Participant passcode: |
5324345# |
Webcast: |
Conference Call Replay
Toll-free dial-in number ( |
1-800-408-3053 |
Local dial-in number: |
905-694-9451 |
Passcode: |
6354190# |
The conference call replay will be available from
Qualified Persons
Except as otherwise disclosed, all scientific and technical information contained in this press release has been reviewed and approved by
About
Allied Gold is a Canadian-based gold producer with a significant growth profile and mineral endowment which operates a portfolio of three producing assets and development projects located in Côte d'Ivoire,
END NOTES
(1) |
This is a non-GAAP financial performance measure. Refer to the Non-GAAP Financial Performance Measures section at the end of this news release. |
(2) |
Net earnings and adjustments to net earnings represent amounts attributable to Allied Corporate equity holders. |
(3) |
The Government of |
(4) |
Calculated on a 1,000,000 exposure-hour basis. |
(5) |
Historically, Cost of sales was presented inclusive of DA. Cost of sales is the sum of mine production costs, royalties, and refining cost, while DA refers to the sum of depreciation and amortization of mining interests. Starting in the prior year, these figures appear on the face of the Consolidated Financial Statements. The metric "Total cost of sales per ounce sold" is defined as Cost of sales inclusive of DA, divided by ounces sold. |
NON-GAAP FINANCIAL PERFORMANCE MEASURES
The Company has included certain non-GAAP financial performance measures to supplement its Condensed Consolidated Interim Financial Statements, which are presented in accordance with IFRS, including the following:
- Cash costs per gold ounce sold;
- AISC per gold ounce sold;
- Gross profit excluding DA;
- Sustaining, Expansionary and Exploration Capital Expenditures;
- Adjusted Net Earnings (Loss) and Adjusted Net Earnings (Loss) per share; and
- EBITDA and Adjusted EBITDA
The Company believes that these measures, together with measures determined in accordance with IFRS, provide investors with an improved ability to evaluate the underlying performance of the Company.
Non-GAAP financial performance measures, including cash costs, AISC, Gross profit excluding DA, Sustaining, Expansionary and Exploration Capital Expenditures, Adjusted Net Earnings (Loss), Adjusted Net Earnings (Loss) per Share, EBITDA and Adjusted EBITDA, do not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies. Non-GAAP financial performance measures intend to provide additional information, and should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS and are not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
Management's determination of the components of non-GAAP financial performance measures and other financial measures are evaluated on a periodic basis, influenced by new items and transactions, a review of investor uses and new regulations as applicable. Any changes to the measures are described and retrospectively applied, as applicable. Subtotals and per unit measures may not calculate based on amounts presented in the following tables due to rounding.
The measures of cash costs and AISC, along with revenue from sales, are considered to be key indicators of a Company's ability to generate operating earnings and cash flows from its mining operations. This data is furnished to provide additional information and is a non-GAAP financial performance measure.
CASH COSTS PER GOLD OUNCE SOLD
Cash costs include mine site operating costs such as mining, processing, administration, production taxes and royalties which are not based on sales or taxable income calculations. Cash costs exclude DA, exploration costs, accretion and amortization of reclamation and remediation, and capital, development and exploration spend. Cash costs include only items directly related to each mine site, and do not include any cost associated with the general corporate overhead structure.
The Company discloses cash costs because it understands that certain investors use this information to determine the Company's ability to generate earnings and cash flows for use in investing and other activities. The Company believes that conventional measures of performance prepared in accordance with IFRS do not fully illustrate the ability of its operating mines to generate cash flows. The most directly comparable IFRS measure is cost of sales. As aforementioned, this non-GAAP measure does not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies, should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
Cash costs are computed on a weighted average basis, with the aforementioned costs, net of by-product revenue credits from sales of silver, being the numerator in the calculation, divided by gold ounces sold.
AISC PER GOLD OUNCE SOLD
AISC figures are calculated generally in accordance with a standard developed by the
AISC include cash costs (as defined above), mine sustaining capital expenditures (including stripping), sustaining mine-site exploration and evaluation expensed and capitalized, and accretion and amortization of reclamation and remediation. AISC exclude capital expenditures attributable to projects or mine expansions, exploration and evaluation costs attributable to growth projects, DA, income tax payments, borrowing costs and dividend payments. AISC include only items directly related to each mine site, and do not include any cost associated with the general corporate overhead structure. As a result, Total AISC represent the weighted average of the three operating mines, and not a consolidated total for the Company. Consequently, this measure is not representative of all of the Company's cash expenditures.
Sustaining capital expenditures are expenditures that do not increase annual gold ounce production at a mine site and excludes all expenditures at the Company's development projects as well as certain expenditures at the Company's operating sites that are deemed expansionary in nature, such as the Sadiola Phased Expansion, the construction and development of Kurmuk and the PB5 pushback at Bonikro. Exploration capital expenditures represent exploration spend that has met criteria for capitalization under IFRS.
The Company discloses AISC, as it believes that the measure provides useful information and assists investors in understanding total sustaining expenditures of producing and selling gold from current operations, and evaluating the Company's operating performance and its ability to generate cash flow. The most directly comparable IFRS measure is cost of sales. As aforementioned, this non-GAAP measure does not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies, should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
AISC are computed on a weighted average basis, with the aforementioned costs, net of by-product revenue credits from sales of silver, being the numerator in the calculation, divided by gold ounces sold.
The following tables provide detailed reconciliations from total costs of sales to cash costs(1) and AISC(1). Subtotals and per unit measures may not calculate based on amounts presented in the following tables due to rounding.
(In thousands of US Dollars, unless otherwise noted) |
For three months ended |
For three months ended |
||||||
Bonikro |
Agbaou |
Sadiola |
Total |
Bonikro |
Agbaou |
Sadiola |
Total |
|
Cost of Sales, excluding DA |
$ 24,064 |
$ 33,584 |
$ 60,245 |
$ 117,893 |
$ 23,731 |
$ 34,708 |
$ 52,525 |
$ 110,964 |
DA |
10,476 |
1,126 |
1,402 |
13,004 |
5,521 |
938 |
2,115 |
8,574 |
Cost of Sales |
$ 34,540 |
$ 34,710 |
$ 61,647 |
$ 130,897 |
$ 29,252 |
$ 35,646 |
$ 54,640 |
$ 119,538 |
Cash Cost Adjustments |
|
|
|
|
|
|
|
|
DA |
$ (10,476) |
$ (1,126) |
$ (1,402) |
$ (13,004) |
$ (5,521) |
$ (938) |
$ (2,115) |
$ (8,574) |
Exploration Expenses |
(213) |
(2,254) |
(587) |
(3,054) |
(237) |
(2,235) |
(2,213) |
(4,685) |
Agbaou Contingent Consideration |
— |
36 |
— |
36 |
— |
802 |
— |
802 |
Silver by-Product credit |
(87) |
(48) |
(127) |
(262) |
(121) |
(40) |
(73) |
(234) |
Total Cash Costs(1) |
$ 23,764 |
$ 31,318 |
$ 59,531 |
$ 114,613 |
$ 23,373 |
$ 33,235 |
$ 50,239 |
$ 106,847 |
|
|
|
|
|
|
|
|
|
AISC(1) Adjustments |
|
|
|
|
|
|
|
|
Reclamation & Remediation Accretion |
$ 218 |
$ 318 |
$ 561 |
$ 1,097 |
$ 171 |
$ 241 |
$ 452 |
$ 864 |
|
2,090 |
— |
— |
2,090 |
837 |
— |
— |
837 |
Exploration Expenses |
213 |
2,254 |
587 |
3,054 |
237 |
2,235 |
2,213 |
4,685 |
Sustaining Capital Expenditures |
2,559 |
1,269 |
1,998 |
5,826 |
630 |
1,969 |
3,066 |
5,665 |
IFRS 16 Lease Adjustments |
— |
30 |
— |
30 |
— |
28 |
— |
28 |
Total AISC(1) |
$ 28,844 |
$ 35,189 |
$ 62,677 |
$ 126,710 |
$ 25,248 |
$ 37,708 |
$ 55,970 |
$ 118,926 |
|
|
|
|
|
|
|
|
|
Gold Ounces Sold |
19,036 |
15,066 |
50,509 |
84,611 |
21,782 |
17,727 |
35,864 |
75,373 |
|
|
|
|
|
|
|
|
|
Cost of Sales per Gold Ounce Sold |
$ 1,814 |
$ 2,304 |
$ 1,221 |
$ 1,547 |
$ 1,343 |
$ 2,011 |
$ 1,524 |
$ 1,586 |
Cash Cost(1) per Gold Ounce Sold |
$ 1,248 |
$ 2,079 |
$ 1,179 |
$ 1,355 |
$ 1,073 |
$ 1,875 |
$ 1,401 |
$ 1,418 |
AISC(1) per Gold Ounce Sold |
$ 1,515 |
$ 2,336 |
$ 1,241 |
$ 1,498 |
$ 1,159 |
$ 2,127 |
$ 1,561 |
$ 1,578 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
(In thousands of US Dollars, unless otherwise noted) |
For six months ended |
For six months ended |
||||||
Bonikro |
Agbaou |
Sadiola |
Total |
Bonikro |
Agbaou |
Sadiola |
Total |
|
Cost of Sales, excluding DA |
$ 54,285 |
$ 71,948 |
$ 114,973 |
$ 241,206 |
$ 50,612 |
$ 70,660 |
$ 112,580 |
$ 233,852 |
DA |
20,315 |
3,460 |
3,364 |
27,139 |
12,336 |
1,804 |
3,575 |
17,715 |
Cost of Sales |
$ 74,600 |
$ 75,408 |
$ 118,337 |
$ 268,345 |
$ 62,948 |
$ 72,464 |
$ 116,155 |
$ 251,567 |
Cash Cost Adjustments |
|
|
|
|
|
|
|
|
DA |
$ (20,315) |
$ (3,460) |
$ (3,364) |
$ (27,139) |
$ (12,336) |
$ (1,804) |
$ (3,575) |
$ (17,715) |
Exploration Expenses |
(387) |
(4,871) |
(2,626) |
(7,884) |
(407) |
(4,034) |
(3,863) |
(8,304) |
Agbaou Contingent Consideration |
— |
719 |
— |
719 |
— |
1,600 |
— |
1,600 |
Silver by-Product credit |
(201) |
(92) |
(227) |
(520) |
(227) |
(82) |
(137) |
(446) |
Total Cash Costs(1) |
$ 53,697 |
$ 67,704 |
$ 112,120 |
$ 233,521 |
$ 49,978 |
$ 68,144 |
$ 108,580 |
$ 226,702 |
|
|
|
|
|
|
|
|
|
AISC(1) Adjustments to Total Cash Costs(1) noted above |
|
|
|
|
|
|
|
|
Reclamation & Remediation Accretion |
$ 436 |
$ 636 |
$ 1,121 |
$ 2,193 |
$ 343 |
$ 482 |
$ 905 |
$ 1,730 |
|
3,740 |
— |
— |
3,740 |
1,605 |
— |
— |
1,605 |
Exploration Expenses |
387 |
4,871 |
2,626 |
7,884 |
407 |
4,034 |
3,863 |
8,304 |
Sustaining Capital Expenditures |
7,585 |
2,215 |
2,468 |
12,268 |
1,914 |
3,030 |
4,663 |
9,607 |
IFRS 16 Lease Adjustments |
— |
56 |
— |
56 |
— |
56 |
— |
56 |
Total AISC(1) |
$ 65,845 |
$ 75,482 |
$ 118,335 |
$ 259,662 |
$ 54,247 |
$ 75,746 |
$ 118,011 |
$ 248,004 |
|
|
|
|
|
|
|
|
|
Gold Ounces Sold |
40,340 |
34,030 |
95,377 |
169,747 |
44,379 |
36,094 |
78,375 |
158,848 |
|
|
|
|
|
|
|
|
|
Cost of Sales per Gold Ounce Sold |
$ 1,849 |
$ 2,216 |
$ 1,241 |
$ 1,581 |
$ 1,418 |
$ 2,008 |
$ 1,482 |
$ 1,584 |
Cash Cost(1) per Gold Ounce Sold |
$ 1,331 |
$ 1,990 |
$ 1,176 |
$ 1,376 |
$ 1,126 |
$ 1,888 |
$ 1,385 |
$ 1,427 |
AISC(1) per Gold Ounce Sold |
$ 1,632 |
$ 2,218 |
$ 1,241 |
$ 1,530 |
$ 1,222 |
$ 2,099 |
$ 1,506 |
$ 1,561 |
GROSS PROFIT EXCLUDING DDA
The Company uses the financial measure "Gross Profit excluding DDA" to supplement information in its financial statements. The Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors and analysts use this information to evaluate the Company's performance.
Gross profit excluding DDA is calculated as Gross Profit plus DDA.
The Company discloses Gross Profit excluding DDA because it understands that certain investors use this information to determine the Company's ability to generate earnings and cash flows. The Company believes that conventional measures of performance prepared in accordance with IFRS do not fully illustrate the ability of its operating mines to generate cash flows. The most directly comparable IFRS measure is Gross Profit. As aforementioned, this non-GAAP measure does not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies, should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
The reconciliation of Gross Profit to Gross Profit Excluding DDA can be found on page 10 of this press release and in Section 1: Highlights and Relevant Updates of the Company's MD&A, under the Summary of Financial Results and Section 4: Review of Operations and Mine Performance, for the relevant mines.
ADJUSTED NET EARNINGS (LOSS) AND ADJUSTED NET EARNINGS (LOSS) PER SHARE
The Company uses the financial measures "Adjusted Net Earnings (Loss)" and the non-GAAP ratio "Adjusted Net Earnings (Loss) per share" to supplement information in its financial statements. The Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors and analysts use this information to evaluate the Company's performance.
Adjusted Net Earnings (Loss) and Adjusted Net Earnings (Loss) per share are calculated as Net Earnings (Loss) attributable to Shareholders of the Company, excluding non-recurring items, items not related to a particular periods and/or not directly related to the core mining business such as the following, with notation of Gains (Losses) as they would show up on the financial statements.
- Gains (losses) related to the reverse takeover transaction events and other items,
- Gains (losses) on the revaluation of historical call and put options,
- Unrealized Gains (losses) on financial instruments and embedded derivatives,
- Write-offs (reversals) on mineral interest, exploration and evaluation and other assets,
- Gains (losses) on sale of assets,
- Unrealized foreign exchange gains (losses),
- Share-based (expense) and other share-based compensation,
- Unrealized foreign exchange gains (losses) related to revaluation of deferred income tax asset and liability on non-monetary items,
- Deferred income tax recovery (expense) on the translation of foreign currency inter-corporate debt,
- One-time tax adjustments to historical deferred income tax balances relating to changes in enacted tax rates,
- Non-recurring provisions,
- Any other non-recurring adjustments and the tax impact of any of these adjustments calculated at the statutory effective rate for the same jurisdiction as the adjustment.
Non-recurring adjustments from unusual events or circumstances are reviewed from time to time based on materiality and the nature of the event or circumstance.
Management uses these measures for internal valuation of the core mining performance for the period and to assist with planning and forecasting of future operations. Management believes that the presentation of Adjusted Net Earnings (Loss) and Adjusted Net Earnings (Loss) per share provide useful information to investors because they exclude non-recurring items, items not related to or not indicative of current or future periods' results and/or not directly related to the core mining business and are a better indication of the Company's profitability from operations as evaluated by internal management and the board of directors. The items excluded from the computation of Adjusted Net Earnings (Loss) and Adjusted Net Earnings (Loss) per share, which are otherwise included in the determination of Net Earnings (Loss) and Net Earnings (Loss) per share prepared in accordance with IFRS, are items that the Company does not consider to be meaningful in evaluating the Company's past financial performance or the future prospects and may hinder a comparison of its period-to-period profitability.
The most directly comparable IFRS measure is Net Earnings (Loss). As aforementioned, this non-GAAP measure does not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies, should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
The reconciliation of Net Earnings (Loss) to attributable to Shareholders of the Company to Adjusted Net Earnings (Loss) can be found on pages 10 and 11 of this press release and in Section 1: Highlights and Relevant Updates of the Company's MD&A, under the Summary of Financial Results.
EBITDA AND ADJUSTED EBITDA
The Company uses the financial measures "EBITDA" and "Adjusted EBITDA" to supplement information in its financial statements. The Company believes that in addition to conventional measures prepared in accordance with IFRS, the Company and certain investors and analysts use this information to evaluate the Company's performance.
EBITDA is calculated as Net Earnings (Loss), plus Finance Costs, DDA, Current income tax expense and Deferred income tax expense. Adjusted EBITDA calculated is further calculated as EBITDA, excluding non-recurring items, items not related to a particular periods and/or not directly related to the core mining business such as the following, with notation of Gains (Losses) as they would show up on the financial statements.
- Gains (losses) on the revaluation of historical call and put options,
- Unrealized Gains (losses) on financial instruments and embedded derivatives,
- Write-offs (reversals) on mineral interest, exploration and evaluation and other assets,
- Gains (losses) on sale of assets,
- Unrealized foreign exchange gains (losses),
- Share-based (expense) and other share-based compensation,
- Unrealized foreign exchange gains (losses) related to revaluation of deferred income tax asset and liability on non-monetary items,
- Non-recurring provisions,
- Non-recurring adjustments from unusual events or circumstances are reviewed from time to time based on materiality and the nature of the event or circumstance.
Management uses these measures for internal valuation of the cash flow generation ability of the period and to assist with planning and forecasting of future operations. Management believes that the presentation of EBITDA and Adjusted EBITDA provide useful information to investors because they exclude non-recurring items, items not related to or not indicative of current or future periods' results and/or not directly related to the core mining business and are a better indication of the Company's cash flow from operations as evaluated by internal management and the board of directors. The items excluded from the computation of Adjusted EBITDA, which are otherwise included in the determination of Net Earnings (Loss) prepared in accordance with IFRS, are items that the Company does not consider to be meaningful in evaluating the Company's past financial performance or the future prospects and may hinder a comparison of its period-to-period performance comparisons.
The most directly comparable IFRS measure is Net Earnings (Loss). As aforementioned, this non-GAAP measure does not have any standardized meaning prescribed under IFRS, and therefore may not be comparable to similar measures employed by other companies, should not be considered in isolation as a substitute for measures of performance prepared in accordance with IFRS, and is not necessarily indicative of operating costs, operating earnings or cash flows presented under IFRS.
(In thousands of US Dollars) |
For three months ended |
For six months ended |
||
2024 |
2023 |
2024 |
2023 |
|
Net Earnings (Loss) |
$ 16,419 |
$ 3,938 |
$ 15,577 |
$ (15,423) |
Finance (income) costs, net |
$ 7,082 |
$ 6,773 |
$ 12,719 |
$ 12,712 |
DDA |
13,004 |
8,575 |
27,139 |
17,714 |
Current income tax expense |
18,894 |
6,387 |
27,380 |
19,923 |
Deferred income tax (expense) recovery |
769 |
1,234 |
5,748 |
1,683 |
EBITDA(1) |
$ 56,168 |
$ 26,907 |
$ 88,563 |
$ 36,609 |
(In thousands of US Dollars) |
For three months ended |
For six months ended |
||
2024 |
2023 |
2024 |
2023 |
|
EBITDA(1) |
$ 56,168 |
$ 26,907 |
$ 88,563 |
$ 36,609 |
(Gain) loss on revaluation of call and put options |
— |
(4,454) |
— |
5,546 |
Loss on revaluation of financial instrument |
2,099 |
667 |
3,882 |
1,813 |
Impairment of exploration and evaluation asset |
— |
— |
— |
— |
Foreign exchange |
568 |
— |
832 |
1,558 |
Share-based compensation |
2,011 |
3,686 |
4,138 |
3,687 |
Other adjustments |
2,881 |
(1,798) |
4,963 |
(3,641) |
Adjusted EBITDA(1) |
$ 63,727 |
$ 25,008 |
$ 102,378 |
$ 45,572 |
CAUTIONARY STATEMENT REGARDING FORWARD-LOOKING INFORMATION
This press release contains "forward-looking information" including "future oriented financial information" under applicable Canadian securities legislation. Except for statements of historical fact relating to the Company, information contained herein constitutes forward-looking information, including, but not limited to, any information as to the Company's strategy, objectives, plans or future financial or operating performance. Forward-looking statements are characterized by words such as "plan", "expect", "budget", "target", "project", "intend", "believe", "anticipate", "estimate" and other similar words or negative versions thereof, or statements that certain events or conditions "may", "will", "should", "would" or "could" occur. In particular, forward looking information included in this press release includes, without limitation, statements with respect to:
- the Company's expectations in connection with the production and exploration, development and expansion plans at the Company's projects discussed herein being met;
- the Company's plans to continue building on its base of significant gold production, development-stage properties, exploration properties and land positions in Mali, Côte d'Ivoire and
Ethiopia through optimization initiatives at existing operating mines, development of new mines, the advancement of its exploration properties and, at times, by targeting other consolidation opportunities with a primary focus inAfrica ; - the Company's expectations relating to the performance of its mineral properties;
- the estimation of Mineral Reserves and Mineral Resources;
- the timing and amount of estimated future production;
- the estimation of the life of mine of the Company's projects;
- the timing and amount of estimated future capital and operating costs;
- the costs and timing of exploration and development activities;
- the Company's expectation regarding the timing of feasibility or pre-feasibility studies, conceptual studies or environmental impact assessments;
- the effect of government regulations (or changes thereto) with respect to restrictions on production, export controls, income taxes, expropriation of property, repatriation of profits, environmental legislation, land use, water use, land claims of local people, mine safety and receipt of necessary permits;
- the Company's community relations in the locations where it operates and the further development of the Company's social responsibility programs; and
- the Company's expectations regarding the payment of any future dividends.
Forward-looking information is based on the opinions, assumptions and estimates of management considered reasonable at the date the statements are made, and is inherently subject to a variety of risks and uncertainties and other known and unknown factors that could cause actual events or results to differ materially from those projected in the forward-looking information. These factors include the Company's dependence on products produced from its key mining assets; fluctuating price of gold; risks relating to the exploration, development and operation of mineral properties, including but not limited to adverse environmental and climatic conditions, unusual and unexpected geologic conditions and equipment failures; risks relating to operating in emerging markets, particularly
Although the Company has attempted to identify important factors that could cause actual actions, events or results to differ materially from those described in forward-looking information, there may be other factors that could cause actions, events or results to not be as anticipated, estimated or intended. There can be no assurance that forward-looking information will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. The Company undertakes no obligation to update forward-looking information if circumstances or management's estimates, assumptions or opinions should change, except as required by applicable law. The reader is cautioned not to place undue reliance on forward-looking information. The forward-looking information contained herein is presented for the purpose of assisting investors in understanding the Company's expected financial and operational performance and results as at and for the periods ended on the dates presented in the Company's plans and objectives and may not be appropriate for other purposes.
CAUTIONARY NOTE TO U.S. INVESTORS REGARDING ESTIMATES OF MEASURED, INDICATED AND INFERRED RESOURCES
This press release uses the terms "Measured", "Indicated" and "Inferred" Mineral Resources as defined in accordance with NI 43-101.
NOTES ON MINERAL RESERVES AND MINERAL RESOURCES
Mineral Resources are stated effective as at
Mineral Reserves are stated effective as at
- are inclusive of the Mineral Resources which were converted in line with the material classifications based on the level of confidence within the Mineral Resource estimate;
- reflect that portion of the Mineral Resources which can be economically extracted by open pit methods;
- consider the modifying factors and other parameters, including but not limited to the mining, metallurgical, social, environmental, statutory and financial aspects of the project;
- include an allowance for mining dilution and ore loss; and
- were reported using cut-off grades that vary by ore type due to variations in recoveries and operating costs. The cut-off grades and pit shells were based on a
$1,500 /ounce gold price, except for the Agbalé pit, which was based on a$1,800 /ounce gold price.
Mineral Reserve and Mineral Resource estimates are shown on a 100% basis. Designated government entities and national minority shareholders hold the following interests in each of the mines: 20% of Sadiola, 10.11% of Bonikro and 15% of Agbaou. Only a portion of the government interests are carried. The Government of
The Mineral Resource and Mineral Reserve estimates for each of the Company's mineral properties have been approved by the qualified persons within the meaning of NI 43-101 as set forth below:
Qualified Person of Mineral Reserves |
Qualified Person of Mineral Resources |
|
|
Mineral Reserves (Proven and Probable)
The following table sets forth the Mineral Reserve estimates for the Company's mineral properties at
|
Proven Mineral Reserves |
Probable Mineral Reserves |
Total Mineral Reserves |
||||||
|
Tonnes |
Grade |
Content |
Tonnes |
Grade |
Content |
Tonnes |
Grade |
Content |
|
18,612 |
0.82 |
492 |
137,174 |
1.57 |
6,907 |
155,786 |
1.48 |
7,399 |
|
21,864 |
1.51 |
1,063 |
38,670 |
1.35 |
1,678 |
60,534 |
1.41 |
2,742 |
|
4,771 |
0.71 |
108 |
8,900 |
1.62 |
462 |
13,671 |
1.30 |
571 |
|
1,815 |
2.01 |
117 |
6,092 |
1.79 |
351 |
7,907 |
1.84 |
469 |
Total Mineral Reserves |
47,061 |
1.18 |
1,782 |
190,836 |
1.53 |
9,399 |
237,897 |
1.46 |
11,180 |
Notes:
- Mineral Reserves are stated effective as at
December 31, 2023 and estimated in accordance with CIM Standards and NI 43-101. - Shown on a 100% basis.
- Reflects that portion of the Mineral Resource which can be economically extracted by open pit methods.
- Considers the modifying factors and other parameters, including but not limited to the mining, metallurgical, social, environmental, statutory and financial aspects of the project.
- Includes an allowance for mining dilution at 8% and ore loss at 3%
- A base gold price of
$1500 /oz was used for the pit optimization, with the selected pit shells using values of$1320 /oz (revenue factor 0.88) for Sadiola Main and$1500 /oz (revenue factor 1.00) for FE3, FE4, Diba, Tambali and Sekekoto. - The cut-off grades used for Mineral Reserves reporting were informed by a
$1500 /oz gold price and vary from 0.31 g/t to 0.73 g/t for different ore types due to differences in recoveries, costs for ore processing and ore haulage.
- Includes an allowance for mining dilution at 18% and ore loss at 2%
- A base gold price of
$1500 /oz was used for the pit optimization, with the selected pit shells using values of$1320 /oz (revenue factor 0.88) for Ashashire and$1440 /oz (revenue factor 0.96) forDish Mountain . - The cut-off grades used for Mineral Reserves reporting were informed by a
$1500 /oz gold price and vary from 0.30 g/t to 0.45 g/t for different ore types due to differences in recoveries, costs for ore processing and ore haulage.
- Includes an allowance for mining dilution at 8% and ore loss at 5%
- A base gold price of
$1500 /oz was used for the Mineral Reserves for the Bonikro pit:- With the selected pit shell using a value of
$1388 /oz (revenue factor 0.925). - Cut-off grades vary from 0.68 to 0.74 g/t Au for different ore types due to differences in recoveries, costs for ore processing and ore haulage.
- With the selected pit shell using a value of
- A base gold price of
$1800 /oz was used for the Mineral Reserves for the Agbalé pit:- With the selected pit shell using a value of
$1800 /oz (revenue factor 1.00). - Cut-off grades vary from 0.58 to 1.00 g/t Au for different ore types to the Agbaou processing plant due to differences in recoveries, costs for ore processing and ore haulage
- With the selected pit shell using a value of
- Includes an allowance for mining dilution at 26% and ore loss at 1%
- A base gold price of
$1500 /oz was used for the Mineral Reserves for the:- Pit designs (revenue factor 1.00) apart from North Gate (Stage 41) and South Sat (Stage 215) pit designs which used a higher short term gold price of
$1800 /oz and account for 49 koz or 10% of the Mineral Reserves. - Cut-off grades which range from 0.49 to 0.74 g/t for different ore types due to differences in recoveries, costs for ore processing and ore haulage.
- Pit designs (revenue factor 1.00) apart from North Gate (Stage 41) and South Sat (Stage 215) pit designs which used a higher short term gold price of
Mineral Resources (Measured, Indicated, Inferred)
The following table set forth the Measured and Indicated Mineral Resource estimates (inclusive of Mineral Reserves) and for the Company's mineral properties at
|
Measured Mineral Resources |
Indicated Mineral Resources |
Total Measured and Indicated |
||||||
|
Tonnes |
Grade |
Content |
Tonnes |
Grade |
Content |
Tonnes |
Grade |
Content |
|
20,079 |
0.86 |
557 |
205,952 |
1.53 |
10,101 |
226,031 |
1.47 |
10,659 |
|
20,472 |
1.74 |
1,148 |
37,439 |
1.64 |
1,972 |
57,911 |
1.68 |
3,120 |
|
7,033 |
0.98 |
222 |
25,793 |
1.41 |
1,171 |
32,826 |
1.32 |
1,393 |
|
2,219 |
2.15 |
154 |
11,130 |
1.96 |
701 |
13,349 |
1.99 |
855 |
Total Mineral Resources (M&I) |
49,804 |
1.30 |
2,081 |
280,315 |
1.55 |
13,945 |
330,118 |
1.51 |
16,027 |
The following table set forth the Inferred Mineral Resource estimates and for the Company's mineral properties at
|
Inferred Mineral Resources |
||
|
Tonnes |
Grade |
Content |
|
16,177 |
1.12 |
581 |
|
5,980 |
1.62 |
311 |
|
19,588 |
1.30 |
816 |
|
959 |
1.84 |
57 |
Total Mineral Resources (Inferred) |
42,704 |
1.29 |
1,765 |
Notes:
- Mineral Resources are estimated in accordance with CIM Standards and NI 43-101.
- Shown on a 100% basis.
- Are inclusive of Mineral Reserves. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability.
- Are listed at 0.5 g/t Au cut-off grade, constrained within an
US$1800 /oz pit shell and depleted to31 December 2023 . - Rounding of numbers may lead to discrepancies when summing columns.
As part of the Company's broader objective of becoming more self-reliant, backup generators were successfully installed in the second quarter at its Côte d'Ivoire operations for an initial unbudgeted cash outlay of
View original content to download multimedia:https://www.prnewswire.com/news-releases/allied-gold-announces-second-quarter-2024-results-setting-the-stage-for-a-strong-second-half-with-critical-investments-to-sustain-production-and-realize-unparalleled-growth-potential-302218460.html
SOURCE